Powered by Blogger.

Delay Analysis and Optimality of Scheduling Policies for Multi-Hop Wireless Networks

. Delay Analysis and Optimality of Scheduling Policies for Multi-Hop Wireless Networks
 Abstract
We analyze the delay performance of a multi-hop wireless network in which the routes between source-destination pairs are fixed. We develop a new queue grouping technique to handle the complex correlations of the service process resulting from the multi-hop nature of the flows and their mutual sharing of the wireless medium. A general set based interference model is assumed that imposes constraints on links that can be served simultaneously at any given time. These interference constraints are used to obtain a fundamental lower bound on the delay performance of any scheduling policy for the system. We present a systematic methodology to derive such lower bounds. For a special wireless system, namely the clique, we design a policy that is sample path delay optimal. For the tandem queue network, where the delay optimal policy is known, the expected delay of the optimal policy numerically coincides with the lower bound. The lower bound analysis provides useful insights into the design and analysis of optimal or nearly optimal scheduling policies.
Existing System
 A large number of studies on multi-hop wireless networks have been devoted to system stability while maximizing metrics like throughput or utility. These metrics measure the performance of a system over a long time-scale. For a large class of applications such as video or voice over IP, embedded network control and for system design; metrics like delay are of prime importance. The delay performance of wireless networks, however, has largely been an open problem. This problem is notoriously difficult even in the context of wireline networks, primarily because of the complex interactions in the network (e.g., superposition, routing, departure, etc.) that make its analysis amenable only in very special cases like the product form networks. The problem is further exacerbated by the mutual interference inherent in wireless networks which, complicates both the scheduling mechanisms and their analysis. Some novel analytical techniques to compute useful lower bound and delay estimates for wireless networks with singlehop traffic were developed in. However, the analysis is not directly applicable to multi-hop wireless network with multihop flows, due to the difficulty in characterizing the departure process at intermediate links. The metric of interest in this paper is the system-wide average delay of a packet from the source to its corresponding destination. We present a new, systematic methodology to obtain a fundamental lower bound on the average packet delay in the system under any scheduling policy. Furthermore, we re-engineer well known scheduling policies to achieve good delay performance viz-a-viz the lower bound.
Proposed System
We analyze a multi-hop wireless network with multiple source-destination pairs, given routing and traffic information. Each source injects packets in the network, which traverses through the network until it reaches the destination. For example, a multi-hop wireless network with three flows is shown in Fig. 1. The exogenous arrival processes AI (t), AII (t) and AIII (t) correspond to the number of packets injected in the system at time t. A packet is queued at each node in its path where it waits for an opportunity to be transmitted. Since the transmission medium is shared, concurrent transmissions can interfere with each others’ transmissions. The set of links that do not cause interference with each other can be scheduled simultaneously, and we call them activation vectors (matchings). We do not impose any a priori restriction on the set of allowed activation vectors, i.e., they can characterize any combinatorial interference model. For example, in a K-hop interference model, the links scheduled simultaneously are separated by at least K hops. In the example show in Fig. 1, each link has unit capacity; i.e., at most one packet can be transmitted in a slot. For the above example, we assume a 1-hop interference model.

 If you want to more information available here  DOWNLOAD
 
Share on Google Plus

About Unknown

This is a short description in the author block about the author. You edit it by entering text in the "Biographical Info" field in the user admin panel.
    Blogger Comment
    Facebook Comment

0 comments:

Post a Comment